Search found 4 matches

by sareetalk@gmail.com
Mon Dec 15, 2014 15:08
Forum: MOHID Water
Topic: Begineer
Replies: 5
Views: 2725

Re: Begineer

My domain is very small, the total length of river is 2280 m and width is 70 m. so i made very fine grid cell size of 1.07 m in i-direction and 1.52 m in j-direction ( later it will be easy to add the pier with that grid size). I provided constant discharge in upstream boundary to all the cell along...
by sareetalk@gmail.com
Wed Dec 10, 2014 10:08
Forum: MOHID Water
Topic: Begineer
Replies: 5
Views: 2725

Re: Begineer

Thank you very much, I was going through that manual for long time but it couldn't solve my problem..
by sareetalk@gmail.com
Tue Dec 09, 2014 10:17
Forum: MOHID Water
Topic: Begineer
Replies: 5
Views: 2725

Re: Begineer

Thank you very much, my concern is if i have to give upstream boundry condition discharge, then i have to define all the grid cell or i can give in only on cell.. if i have to define every cell then its too much work, similarly i want to give water level as a downstream boundry condition, and i didn...
by sareetalk@gmail.com
Mon Dec 08, 2014 09:00
Forum: MOHID Water
Topic: Begineer
Replies: 5
Views: 2725

Begineer

Hi, i am a begineer and my problem is i dont know how to input simple upstream discharge as a boundry condition and downstream water level in a simple river bathymetry. I already made bathymetry in the MOHID GIS. So please anyone can help me.. After this hydrodynamic simulation i will input morpholo...

Go to advanced search